Key dates
  • School starts Monday, Aug. 10, 2026 and ends Friday, June 4, 2027.
  • Thanksgiving break: Nov. 23 to 27. Students are out Saturday, Nov. 21 to Sunday, Nov. 29, back Monday, Nov. 30.
  • Winter break: Dec. 21 to Jan. 1. Students are out Saturday, Dec. 19 to Monday, Jan. 4, back Tuesday, Jan. 5.
  • Spring break: April 5 to 9. Students are out Saturday, April 3 to Sunday, April 11, back Monday, April 12.
  • Nine early release days for every school. Details below.

The MVLA 2026-27 calendar

This is the district's own calendar, as MVLA publishes it. Tap it to open the full-size image.

The Mountain View Los Altos High School District 2026-27 School Year Calendar: month grids from July 2026 to June 2027 with holidays marked H, recess days R, the first day and quarter ends in green, professional learning and teacher work days in orange, finals in yellow and progress reports in blue, and a dated list of each month's events with its school-day count.
Calendar by Mountain View Los Altos High School District. Get the original from the district: the calendar PDF or its calendar page.

Add the MVLA calendar to your phone

Pick a file. Each one is an all-day event per day off or half day, and a break is one event across all its days.

Every date First and last day, every day off, every early release and grading period dates. 28 events.
Download .ics
Holidays and breaks Only the days with no school. 11 events.
Download .ics
Early release days Only the half days. 9 events.
Download .ics

On an iPhone

Tap a file above, then tap Add All. The dates go into the calendar you choose.

In Google Calendar

On a computer, open Google Calendar, then Settings, then Import & export. Choose the file and the calendar to add it to. The dates show up on your Android phone too.

In Outlook

Open the downloaded file, or in Outlook on the web go to Add calendar, then Upload from file.

These files are a copy of the calendar today. If the district changes a date, download the file again.

MVLA vacations and holidays, 2026-27

Every day with no school for students, from the first day to the last: 11 entries and 33 weekdays in all.

Day offDatesDays of the weekSchool days off
Labor Day HolidaySept. 7Mon1
October recess days BreakOct. 8 to 9Thu to Fri2
Veterans Day HolidayNov. 11Wed1
Thanksgiving break BreakNov. 23 to 27Mon to Fri5
Winter break BreakDec. 21 to Jan. 1Mon to Fri10
Teacher work day (no school) Staff dayJan. 4Mon1
Martin Luther King Jr. Day HolidayJan. 18Mon1
February break BreakFeb. 15 to 19Mon to Fri5
Recess day BreakMarch 19Fri1
Spring break BreakApril 5 to 9Mon to Fri5
Memorial Day HolidayMay 31Mon1

MVLA early release days

Nine early release days in all.

DateDayWhatDismissalWho
Sept. 1TueProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
Sept. 2WedProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
Oct. 7WedPSAT/SAT day, afternoon professional learningThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
Feb. 2TueProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
Feb. 3WedProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
March 9TueProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
March 10WedProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
April 27TueProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools
April 28WedProfessional learning half dayThe district says its half days are subject to changeHalf day, times vary by schoolAll schools

Where the time varies by school, your school sends its own dismissal time.

Calendar notes: what to plan around

Long weekends and breaks

Every stretch of three or more days with no school, counting weekends.

  • 3-day weekend: Saturday, Sept. 5 to Monday, Sept. 7. Labor Day. Back Tuesday, Sept. 8.
  • 4-day weekend: Thursday, Oct. 8 to Sunday, Oct. 11. October recess days. Back Monday, Oct. 12.
  • 9 days off in a row: Saturday, Nov. 21 to Sunday, Nov. 29. Thanksgiving break. Back Monday, Nov. 30.
  • 17 days off in a row: Saturday, Dec. 19 to Monday, Jan. 4. Winter break and teacher work day (no school). Back Tuesday, Jan. 5.
  • 3-day weekend: Saturday, Jan. 16 to Monday, Jan. 18. Martin Luther King Jr. Day. Back Tuesday, Jan. 19.
  • 9 days off in a row: Saturday, Feb. 13 to Sunday, Feb. 21. February break. Back Monday, Feb. 22.
  • 3-day weekend: Friday, March 19 to Sunday, March 21. Recess day. Back Monday, March 22.
  • 9 days off in a row: Saturday, April 3 to Sunday, April 11. Spring break. Back Monday, April 12.
  • 3-day weekend: Saturday, May 29 to Monday, May 31. Memorial Day. Back Tuesday, June 1.

Weeks with fewer than five school days

Seven weeks have fewer than five school days, and five weeks have none at all.

Week ofSchool daysWhy
Sept. 74Labor Day
Oct. 53October recess days
Nov. 94Veterans Day
Nov. 230Thanksgiving break
Dec. 210Winter break
Dec. 280Winter break
Jan. 44Teacher work day (no school)
Jan. 184Martin Luther King Jr. Day
Feb. 150February break
March 154Recess day
April 50Spring break
May 314Memorial Day

Teacher workdays: no school for students

One of the days off is a staff day. Teachers work; students stay home. Plan child care as you would for a holiday.

  • Monday, Jan. 4: teacher work day (no school)

Makeup days

The calendar names no makeup days. If school closes for weather, the district announces how the day is made up.

Also worth knowing

  • School is open on a federal holiday: Columbus Day (Monday, Oct. 12). Banks, post offices and many offices close; school does not.
  • The calendar prints no parent-teacher conference days. It lists back-to-school nights instead (see the district's notes). Schools set their own.

First and last day of school

Aug. 10First day, Monday
June 4Last day, Friday
182School days, by our count
33Weekdays off between them

The first day of school is Monday, Aug. 10, 2026. The last day is Friday, June 4, 2027.

Teachers start sooner. Staff days before school run Aug. 3 to 7.

The district prints 182 instructional days across the semesters. Our count of the calendar matches.

Grading periods

Semesters

PeriodDatesSchool days
1st semesterAug. 10 to Dec. 1886
2nd semesterJan. 5 to June 496

Quarters

The calendar prints day counts for the 1st and 3rd quarters only.

PeriodDatesSchool days
1st quarterAug. 10 to Oct. 742
2nd quarterOct. 12 to Dec. 1844
3rd quarterJan. 5 to March 1847
4th quarterMarch 22 to June 449

What the district notes

  • The calendar counts 182 student days (186 for teachers): 86 in the first semester and 96 in the second.
  • The orange professional learning (PL/TW) days in the school year are half days, and the district says they are subject to change. Each school runs its own bell schedule: at Los Altos High, classes end at 12:59 p.m. on the Tuesdays and 12:42 p.m. on the Wednesdays, with lunch after.
  • Back-to-school nights: Los Altos and Mountain View high schools Thursday, Aug. 27; Alta Vista High School Thursday, Sept. 3.
  • Progress reports are mailed Sept. 11 (Q1), Nov. 13 (Q2), Feb. 5 (Q3) and April 30 (Q4).
  • Seniors graduate Friday, June 4, the last day of finals.

Common questions

When does MVLA start in 2026?

The first day of school for Mountain View Los Altos High School District is Monday, Aug. 10, 2026.

When is the last day of school for MVLA in 2027?

The last day for students is Friday, June 4, 2027.

When is winter break for MVLA?

Winter break runs Monday, Dec. 21 to Friday, Jan. 1. Counting weekends and the days next to it, students are out Saturday, Dec. 19 to Monday, Jan. 4 and go back Tuesday, Jan. 5.

When is spring break for MVLA?

Spring break runs Monday, April 5 to Friday, April 9. Counting weekends, students are out Saturday, April 3 to Sunday, April 11 and go back Monday, April 12.

When is Thanksgiving break for MVLA?

Thanksgiving break runs Monday, Nov. 23 to Friday, Nov. 27. Counting weekends, students are out Saturday, Nov. 21 to Sunday, Nov. 29 and go back Monday, Nov. 30.

Does MVLA have early release days in 2026-27?

Yes. Tuesday, Sept. 1 (half day, times vary by school, The district says its half days are subject to change), Wednesday, Sept. 2 (half day, times vary by school, The district says its half days are subject to change), Wednesday, Oct. 7 (half day, times vary by school, The district says its half days are subject to change), Tuesday, Feb. 2 (half day, times vary by school, The district says its half days are subject to change), Wednesday, Feb. 3 (half day, times vary by school, The district says its half days are subject to change), Tuesday, March 9 (half day, times vary by school, The district says its half days are subject to change), Wednesday, March 10 (half day, times vary by school, The district says its half days are subject to change), Tuesday, April 27 (half day, times vary by school, The district says its half days are subject to change) and Wednesday, April 28 (half day, times vary by school, The district says its half days are subject to change) are for every school.

How do I put the MVLA calendar on my phone?

Download one of the .ics files on this page. On an iPhone, open it and tap Add All. On Android or a computer, import it into Google Calendar or Outlook.

How we checked these dates

We read every date off the district's own calendar twice: once from the PDF's text and once from the image, cell by cell against its legend. Then we checked every day off, the finals and the September, February and March half days against the district's Calendars page and the Los Altos High School 2026-27 bell schedules. The other dates rest on the district's calendar alone.

Every weekday on this page matches its date. The district's printed day counts match our own count of its calendar. If the district changes its calendar, its page is the final word.

Where each date is on the district's calendar
  • First day, Aug. 10: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, August grid, 10 in green; list "Aug 10 First Day of School"; "August: 16 days". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "August 10-14 ABCBC First Week of School".
  • Last day, June 4: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, June grid, 4 in yellow (finals); list "June 2, 3 & 4 Finals June", "June 4 Seniors Graduate", "June 4 END OF 2ND SEMESTER (96 days)"; "June: 4 days". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "May 31-June 4 X A Finals Finals Finals, Memorial Day & Finals".
  • Teacher days before school starts, Aug. 3 to 7: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, August grid, 3 and 4 in magenta, 5 and 6 in orange, 7 in pink; list "August 3 & 4 New Teacher Start", "August 5 & 6 Professional Learning (PL)", "Aug 7 Teacher Work Day (TW)".
  • Labor Day, Sept. 7: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, September grid, 7 marked H; list "Sept 7 Labor Day (holiday)". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Sept 7-11 XBCBC Labor Day".
  • October recess days, Oct. 8 to 9: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, October grid, 8 and 9 marked R; list "Oct 8 & 9 Recess Days". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Oct 5-9 C B PSAT X X End of Quarter".
  • Veterans Day, Nov. 11: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, November grid, 11 marked H; list "Nov 11 Veteran's Day (holiday)". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Nov 9-13 CBXBC Veteran's Day".
  • Thanksgiving break, Nov. 23 to 27: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, November grid, 23 to 25 marked R and 26 and 27 marked H; list "Nov 23, 24 & 25 Recess", "Nov 26 Thanksgiving Day (holiday)", "Nov 27 Day after Thanksgiving Day". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Nov 23-27 XXXXX Thanksgiving Break".
  • Winter break, Dec. 21 to Jan. 1: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, December grid, 21 and 22 marked R, 23, 24, 25 and 28 to 31 marked H; January grid, 1 marked H; list "Dec 21 - Jan 1 Holiday Break & Recess". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Dec 21-Jan 1 XXXXX Winter Break".
  • Teacher work day (no school), Jan. 4: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, January grid, 4 in orange; list "Jan 4 TW" and "Jan 5 Students Return"; "January: 18 days" leaves it out. Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Jan 4-8 XBCBC Teacher Work Day".
  • Martin Luther King Jr. Day, Jan. 18: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, January grid, 18 marked H; list "Jan 18 Martin Luther King, Jr. Day (holiday)". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Jan 18-22 XBCBC MLK Jr. Day".
  • February break, Feb. 15 to 19: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, February grid, 15 and 16 marked H, 17 to 19 marked R; list "Feb 15 & 16 President's Day (holiday)", "Feb 17, 18 & 19 Winter Recess". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Feb 15-19 XXXXX Winter Break".
  • Recess day, March 19: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, March grid, 19 marked R; list "March 19 Recess Day". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "March 15-19 CBCBX End of Quarter".
  • Spring break, April 5 to 9: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, April grid, 5 to 9 marked R; list "April 5 -9 Spring Recess". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Apr 5-9 XXXXX Spring Break".
  • Memorial Day, May 31: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, May grid, 31 marked H; list "May 31 Memorial Day (holiday)". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "May 31-June 4 X A Finals Finals Finals, Memorial Day & Finals".
  • Professional learning half day, Sept. 1: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, September grid, 1 in orange; list "Sept 1 & 2 PL/TW"; "half days in orange subject to change". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "August 31-Sept 4 ADEBC PL Week": Tuesday Schedule D (PM Professional Dev).
  • Professional learning half day, Sept. 2: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, September grid, 2 in orange; list "Sept 1 & 2 PL/TW". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "August 31-Sept 4 ADEBC PL Week": Wednesday Schedule E (PM Professional Dev).
  • PSAT/SAT day, afternoon professional learning, Oct. 7: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, October grid, 7 in green (end of quarter); list "Oct 7 END OF 1ST QUARTER (42 days)" and "Oct 7 PSAT/SAT Afternoon PL" in orange. Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Oct 5-9 C B PSAT X X": Wednesday on a PSAT schedule.
  • Professional learning half day, Feb. 2: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, February grid, 2 in orange; list "Feb 2 & 3 PL/TW". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Feb 1-5 ADEBC PL Week": Tuesday Schedule D (PM Professional Dev).
  • Professional learning half day, Feb. 3: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, February grid, 3 in light orange; list "Feb 2 & 3 PL/TW". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "Feb 1-5 ADEBC PL Week": Wednesday Schedule E (PM Professional Dev).
  • Professional learning half day, March 9: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, March grid, 9 in orange; list "March 9 & 10 PL/TW". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "March 8-12 ADEBC PL Week": Tuesday Schedule D (PM Professional Dev).
  • Professional learning half day, March 10: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, March grid, 10 in light orange; list "March 9 & 10 PL/TW". Also: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), "March 8-12 ADEBC PL Week": Wednesday Schedule E (PM Professional Dev).
  • Professional learning half day, April 27: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, April grid, 27 in orange; list "April 27 & 28 PL/TW".
  • Professional learning half day, April 28: Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, April grid, 28 in orange; list "April 27 & 28 PL/TW".
  • Dismissal time, Professional learning half day, Sept. 1: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, Professional learning half day, Sept. 2: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, PSAT/SAT day, afternoon professional learning, Oct. 7: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, Professional learning half day, Feb. 2: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, Professional learning half day, Feb. 3: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, Professional learning half day, March 9: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, Professional learning half day, March 10: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, Professional learning half day, April 27: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • Dismissal time, Professional learning half day, April 28: LAHS Bell Schedules, with the 2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks (PDF), Los Altos High "2026-2027 Schedule For Holiday, Minimum Days, Recess Days & Finals Weeks": PL weeks run ADEBC, so Tuesday is Schedule D and Wednesday Schedule E, both "(PM Professional Dev)" with classes ending at 12:59 and 12:42 p.m. and lunch until 1:40 and 1:25 p.m.; each school keeps its own bell schedule.
  • 1st semester (semesters): Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, December grid, 18 in green; list "Dec 18 END OF 1ST SEMESTER (86 days)".
  • 2nd semester (semesters): Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, June grid, 4; list "June 4 END OF 2ND SEMESTER (96 days)".
  • 1st quarter (quarters): Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, October grid, 7 in green; list "Oct 7 END OF 1ST QUARTER (42 days)".
  • 2nd quarter (quarters): Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, list "Dec 18 END OF 1ST SEMESTER (86 days)"; the 2nd quarter ends with the semester.
  • 3rd quarter (quarters): Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, March grid, 18 in green; list "March 18 END OF 3RD QUARTER (47 days)".
  • 4th quarter (quarters): Mountain View Los Altos High School District 2026-27 School Year Calendar, Board Approved, Last Revised 7/19/2026 (PDF), page 1, list "June 4 END OF 2ND SEMESTER (96 days)"; the 4th quarter ends with the semester.